cancel
Showing results for 
Search instead for 
Did you mean: 

Upgrade of R/3 system to ECC6.0

Former Member
0 Kudos

Hi,

Our backend system is being upgraded to ECC 6.0 and SRM system in SRM 5.0, what are the steps / checks need to be carried out post the upgrade to ECC 6.0?

Rgds,

Madhan

Accepted Solutions (0)

Answers (1)

Answers (1)

masa_139
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hi,

You need to change the backend system version in IMG "Define Backend System".

Regards,

Masa