on 02-19-2010 9:46 AM
Dear QM Gurus,
Our clients are going apply reduce testing for the raw materials.
Material will be tested with limited test and UD will be taken in SAP regularly.
Once in 15 batches , They will perform complete analysis and release in SAP.
We require system control so that after 15 th batch of particular raw material, SAP system should not allow to release
without complete analysis.
Please give us the master and config settings for the same .
Ram ~
Hi,
Use DMR
if you are recording few inspection characteristic in each inspection lot and need to inspect all MIC, every 15th GR.
then use DMR at characteristic level
thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.