on 02-10-2010 12:55 PM
I am using APO SCP V7.0 for a CPG manufacturer.
I need to be able to model 'stock building' for Christmas and Easter.
How can model this using APO SNP?
Thanks in anticipation...
Hi,
You can use time base maintenance of safety stock using methods MZ, MB or MM in location product master on Lot Size page. This way the control can remain with SNP only. But still the better solution is to forecast in DP, rather than building stock in SNP directly.
regards,
biplab
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
You also need to use DP to achieve your scenario.
In Demand planning, you use seasonal planning functionality
and maintain the christmas and easter year periods accordingly
so that forecast gets generated in DP which inturn will get
released to SNP
In SNP. you use MTS scenario (make-to-stock) wherein
depending on the forecast released from DP to SNP, SNP
plans the planned independent requirements and converts it
to stocks during those periods
Regards
R. Senthil Mareeswaran.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
7 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.