on 02-05-2010 7:05 PM
Hi Expert,
In which case we should use Dependenet multiple same and Independent multiple sample?
Is Incomming inspection or inprocess inspection???
What should be master data setting for sampling procedure and sampling schement?
Should we use inspection point in this case or not?
Tom.
no satisfactory answer
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I was in under impression for independent sample that:
"If System accepts the Insp. Lot and the lot is closed, the second sample can not be generated.
If System rejects the Inspection Lot, the Second Sample can be created.
In INDPENDENT MULTIPLE SAMPLE, the second and consecutive samples are to be created manually only."
But this rule is not working in my case, what would be reason?
I have already accepted lot but still system allow me to create new sample.
Tom.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Please refer topic
http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/f0592b95-1ad1-2c10-4782-b9756caa1784
this is something value added
thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
97 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.