on 02-04-2010 12:41 PM
Hi All
I tried using DMR today
It is working fine in LOt creation but when i am ticking UD creation it is not performing as it should
I put the skip of 2 lot s, when i took the UD of lot it is ok logically it should skip 1 and and 2nd lot and it should offer the 3rd lot
But it is not offering the 3rd lot it is carrying on skipping procedure
Please suggest me what steps iam missing
Did you make the UD on the second lot BEFORE you created the 3rd lot?
When done at time of UD, if the previous lot is not UD'ed, the system hasn't advance to the next level yet and in your case remains at the current level.
When you do it at time of creation, you have the opposite issue. If he previous lot isn't completed, and a new lot is created, the level automatically goes to the next level even though you might wind up failing the previous lot.
The main thing is, DMR will not be perfect if you have a system where inspection lots consistently overlap. It works best when you only ever have one open inspection lot at a time.
Craig
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Taking UD & doing stock posting are two differnt activity
Skip means lot will ne genarted with Status SKIP & material in MMBE shows unrestricted.
that means stock is already moved in unrestricted before UD is taken.
it means that even if QA32 shows stock posting screen stock is already skipped you just have to take UD.
Hi,
Maintain the DMR stages as follows:
Stage 1 -> Skips 2 -> New insp stage 2
Stage 2 -> No of insp 1 -> New stage 1
Hope this is helpful.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
104 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.