Dear all,

Here in a company with batch management, for solvent initially the tanker comes at the gate and sample is taken before GR so that if the sample gets passed GR will be done, for this we have done through

model inspection in which we activated 0101 insp type and as the tanker comes to gate we take an insp lot through QI07

but when we do UD for this system will not allow UD without batch number, we can generate batch number through MSC1N

but when we actually do GR one more internal batch number comes as per clients logic, now how to link these two batches

regards

venkat

Former Member
replied

Dear Venkat

I think in that case you can wait till GR happens. So once the Batch number is generated you can give the UD for the source inspection lot

What is the challenge you are facing in this scenario