on 02-02-2010 11:25 AM
Hi Gurus,
We have SAP NetWeaver BI 7.0 in our organization.
Transport system is configured at the time of SAP Implementation.
Transport Route is : BID - BIQ - BIP.
But now we want to make the route from BID - BIP; we dont want BIQ in between.
Is it possible to do the same?
if yes then can you provide me the document or steps.
Thank you so much in advance.
Regards,
Aasmi Gawas.
Hi,
Please go through the below link:
http://www.saptechies.com/stms-configuration-and-transport-route-configuration/
Regards,
Pavan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi ,
As per your requirement you should have two system land scape i.e development and quality in one system and production in one .
1) development and quality in one system :-- you can use one client <xxx> for development activities and other client <xxx> for quality .so in a single system we can have development and quality .
2) there will not have a consolidation route directly delivery route only.
Regards
Zia
Hi All,
Thank you so much for your replies.
We have BI development , BI quality & BI production three different systems.
STMS is already configured 1 year back.
Now we want to remove BI quality system for some reason. so for that first i want to remove BIQ from from transport route.
Transport should be from BI Development to BI Production directly.
How can i do that?
Any body has done this before?
regards,
Aasmi
Yes is possible, and the procedure is in the STMS guide. read it.
http://help.sap.com/saphelp_nw04/helpdata/en/44/b4a0137acc11d1899e0000e829fbbd/frameset.htm
Regards
Juan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
87 | |
23 | |
11 | |
9 | |
8 | |
5 | |
5 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.