cancel
Showing results for 
Search instead for 
Did you mean: 

Two System TMS Configuration

Former Member
0 Kudos

Hi Gurus,

We have SAP NetWeaver BI 7.0 in our organization.

Transport system is configured at the time of SAP Implementation.

Transport Route is : BID - BIQ - BIP.

But now we want to make the route from BID - BIP; we dont want BIQ in between.

Is it possible to do the same?

if yes then can you provide me the document or steps.

Thank you so much in advance.

Regards,

Aasmi Gawas.

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos
Former Member
0 Kudos

hi ,

As per your requirement you should have two system land scape i.e development and quality in one system and production in one .

1) development and quality in one system :-- you can use one client <xxx> for development activities and other client <xxx> for quality .so in a single system we can have development and quality .

2) there will not have a consolidation route directly delivery route only.

Regards

Zia

Former Member
0 Kudos

Hi All,

Thank you so much for your replies.

We have BI development , BI quality & BI production three different systems.

STMS is already configured 1 year back.

Now we want to remove BI quality system for some reason. so for that first i want to remove BIQ from from transport route.

Transport should be from BI Development to BI Production directly.

How can i do that?

Any body has done this before?

regards,

Aasmi

sunny_pahuja2
Active Contributor
0 Kudos

Hi,

all the documents and links are provided above.

You need to just delete the existing transport route and configure Standard two system landscape option and in that enter your development and production system. By this way you can reconfigure your transport route.

Thanks

Sunny

Former Member
0 Kudos

Hi ,

1) delete all the transport routes of quality i.e from development to quality and quality to production in the domain controller

2) delete the stms configuration of quality

3)After deleting configure new routes from development to production.

Former Member
0 Kudos

You can also try this.

go to stms --->> in the same transaction command box give the command DICO ( this will delete the entire tms configuration) and then reconfigure the entire TMS.

Regards.

Pavan

JPReyes
Active Contributor
0 Kudos

Yes is possible, and the procedure is in the STMS guide. read it.

http://help.sap.com/saphelp_nw04/helpdata/en/44/b4a0137acc11d1899e0000e829fbbd/frameset.htm

Regards

Juan