*Hello*

*I have a problem. I have 4 (1000 to 4000) plants in my SAP ECC6.0. Now im configuring new plant which is (5000). I create notification in PM/CS and with refrence of this notification when im trying to create Service order system errors me this.*

*Scheduling parameters for maintenance order have not been entered*

*Message no. CT608*

*Diagnosis*

**No scheduling parameters have been entered for mainteance orders in Customizing plant 5000, order type SM04 and production scheduler . IF you do not enter the scheduling type no scheduling can be carried out.*

*Procedure*

*Enter scheduling parameters for maintenance orders.*

*execute function*

*i have checked in IMG that schedule parametrs are assigned to sm02 in existing 4 plants but not sm04. But in exsiting plants system allows me to create sm04 but not in new plant 5000. Im surprised that if scheduleing parameters are not assigned to sm04 then how system allows in existing plants to create sm04 and why not in new plant 5000?*

*Please help*

Accepted Solutions (1)

Accepted Solutions (1)

Lakshmipathi
Active Contributor
0 Kudos

Check note 378347

thanks

G. Lakshmipathi

moazzam_ali
Active Contributor
0 Kudos

kindly advice how to check this note?

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

Maintain schedule parameter BY T-CODE OPU7

Plant - 5000

Order - sm04

Prod scheduler - * (star)

Scheduling Type - forward

Automatic scheduling - Tickmark

Kapil

Edited by: Kapildev Farakte on Feb 2, 2010 3:08 PM

moazzam_ali
Active Contributor
0 Kudos

i have checked there. I told u that i have already 4 plants which are 1000 2000 3000 and 4000 and i have not assign schedule parameter for Order type SM04 (Service Order With Warranty). But when i create SM04 in plant 1000 system allows me but now in 5000. If i assign in 5000 then it works but Why its not assigned in other plants too?