Material Determination

Former Member
0 Kudos

Hi,

In Material determination, how I will configure, if the 1st substitute material is not available,then system will take the next available substitute material.

Regards,

Kumar

Accepted Solutions (1)

Accepted Solutions (1)

reazuddin_md
Active Contributor
0 Kudos

Assume, You have customized Material determination settings using Condition techinique.

While creating Conditon records in VB11.

material entered ( actual material ) , Material (substitute material) , press enter to continue.

Now press F2- Alternative Materials,

tick mark the "MRP Indicator" , against the material.

then if the substitute material doesnt have stock, then system replace with this 2nd material.

NOTE: in SAP Std, it is limited to one Material, though you can maintain multiple materials in this record.

hope it adds info

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

Goto VB11 and maintain the subtitution material

Example :

Mat Entered----Material

100-100----


100-106

now Select the condition GOTO-->ALTERNATIVE MATERIAL

Maintain Alternative material as many you want.

Example:

Alternative Materials

100-106

500-500

600-600

If the material 100-106 is not available ,system will search for the next material availibility from the alternative material,

Maintain settings in OVRQ - Material subtitution:reasons - strategy as per your need

Regards

Senya

Former Member
0 Kudos

Hi,

Assign Material determination proce procedure to sales document type in OV14

After this create condition records for material determination VB11

Kapil