on 01-31-2010 10:48 PM
Gurus,
I am working with 03 & 04,if required i need to skip inspection for 04 & take a usage decision.I s this possible.What should be done if possible/
The setting to skip 04 inspection type is not differnt form that of the 01.
Use the same settings like Use DMR in task list ,Auto UD & skip indicator in inspection setup.
In addtion to this you plant level setting also remain same.
You can use QA10 or QA40 T code .
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
As already stated, you can use DMR to make 04 skip lots on a regular basis.
If you don't know when you need to do this, you can just go to QA11, (or through QA32), and make the UD. You will have to force close any untested characteristics.
Craig
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
For inspection type 04 , skip the lot procedure will be working If you made the settings
1. DMR in task list ,
2. Auto UD & skip indicator in inspection setup in the material master.
and it same for all the inspection type as like 01.
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.