cancel
Showing results for 
Search instead for 
Did you mean: 

Usage value

Former Member
0 Kudos

Gurus,

I am working with both 03 & 04.I am also working with 04 onlyfor some materials.For 04, though i have given 1 in task list it is still

picking 5 for somewhere though i have not created any Qplan with 5 in QA32.When i assign the 1 i am able record results &

usage.Where is the problem.What should i use in Qplan for 04 1or 5?

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

As Sujit Ji said, the inspection type picking the Qplan usage which is you assigned in the img screen for that type.

Check Qcc3>Inspection lot creation->maintain Inspection type>04 inspection type->check usage in 04

If you assign the usage 5 in the inspection type 04 and if the usage 5 is maintained in the Qplan .

so system automatically pick the uage 5 for this inspection type 04

so if u need usage 01 for the inspection type 04.

go to the path.,

Check Qcc3>Inspection lot creation->maintain Inspection type>04 inspection type->check usage in 04

Enter uage as 01.

Former Member
0 Kudos

GURUS,

I am also using 03 for my requirement, will 03 have any impact if i use 1 in QPlan for 04.

Former Member
0 Kudos

No,As 03 uses Routing & 04 use Inspection plan QP01

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi

Where is the problem.What should i use in Qplan for 04 1or 5?

No doubt Usage must be 1.

Check Qcc3>Inspection lot creation->maintain Inspection type>04 inspection type->check usage in 04 inspection type.

here it must be 1

Regards

Sujit