Hi ;

I have a scenario where we have around 4000 open 09 Inspection lots where the Usage Decision has not been made and results have not been recorded (Setting in MIC is Required) but the stock posting hasbeen carried out .

Want to post the Usage decision for all the Lots ,can't use QA10 as there are open charateristics ( required) or is there a workaround to collectively make the Usage decision without having to enter the results for the MIC.

Thanks

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

best way is to use LSMW or BDC to take UD in QA32

Regards

Sujit

Former Member
0 Kudos

Thanks Sujit for ur reply..I was wondering if we update the MIC to optinal and update the plans using QS27 can we Mass update existing the Insp Lots with the current plan without going thru traditional update via QA02.

Regards

former_member42744
Active Contributor
0 Kudos

No.. inspection lots are not retroactive. Once the lot is created, the characteristics are what they are. Updating the inspection plan has no affect on created lots.

Craig

Answers (2)

Answers (2)

Former Member
0 Kudos

Thanks for all the replies ...Yes,think we'll have to use eCATT

Former Member
0 Kudos

Please Use SECATT for this , its very simple