Gurus,
I raise a prod orderfor 100 nos.I do production.I partially do GR for Production order.After 50 pcs i find the lot is not ok.I need to
move the stk to blocked stk,is it possible?
Hii,
For your information Inprocess inspection is non-stock relevant Inspection type. You cannot post the stock with Inprocess (03) Inspection type & u can only make RR,UD. If u want to make stock psoting activate 04 Inspection type and confrim the after GR from Production.
with regards,
K.Lokesh.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Just remember that 03 is always created for 100% lot Qty.It can not be partial.( no stock posting also)
Partial lot can be created only with 04.
Now if you want to put the material in block stock after stock posting done in case of 04 then it can be done through MB1B -->344
Regards
Sujit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.