cancel
Showing results for 
Search instead for 
Did you mean: 

MATP- error after implementing note

0 Kudos

Dear All,

We are working on MATP scenario. After configuring all the necessary settings we run availability check in simulation.

Initially when we ran availability check for small quantity, it was confirming in APO ( In ATP simulation). But while providing larger quantity, it was showing an ABAP error.

At the same time in R3, system gave an error saying u201Cerror in calling up function u201CBAPI_APOATP_CHECKu201D in APO server XYZ a calculation field is defined too smallu201D while checking availability for larger quantity.

To overcome this situation, we had implemented a note u201C1005131u201D. Now the dump in APO and error message in R3 is not coming, but it not confirming orders.

(When we check materials availability in R3, missing part button does not appear but at the same time system does not confirm any quantity)

Have anyone of you have faced similar situation? Please reply if anyone has any clue regarding this issue.

We are using SCM 7.0

Regards,

Nitesh

Accepted Solutions (1)

Accepted Solutions (1)

pavan_verma2
Contributor
0 Kudos

Hi Nitesh,

Are you using phantom assemblies ?

There can be a error during PDS explosion that causes the error. We faced the same error and implemented note 1147324.

Please implement note 1147324

Thanks,

Pavan Verma

Edited by: Pavan Verma on Jan 21, 2010 11:38 PM

Answers (0)