Budget with modification time (TIMESTMP)

former_member209919
Active Contributor
0 Kudos

Hi,

Does someone knowif there is a table which stores WBS budget with modification time ( not with modification date)? ( Like COSP and COSS for planned and actual cost)

Thanks a lot,

Sara

Accepted Solutions (0)

Answers (4)

Answers (4)

shareeq_hussain
Active Participant
0 Kudos

Please check the standard report CJI8 where you will get the date

Regards,

Shareeq

virendra_pal
Active Contributor
0 Kudos

check table BPBK - has date

Former Member
0 Kudos

Hi,

Yes dates are available in database tables but time i think is not available .

Muzamil

former_member209919
Active Contributor
0 Kudos

What are BPYD and KAEP-BDG exactly?

virendra_pal
Active Contributor
0 Kudos

go to SE11 and check out

former_member209919
Active Contributor
0 Kudos

If I only can see budget by modification date, would be BPVG the best table to obtain this or is there a best option?

Thanks,

Sara

virendra_pal
Active Contributor
0 Kudos

i would use tables within structures BPDY or KAEP_BDG

virendra_pal
Active Contributor
0 Kudos

not sure if the time is actually stored . . . .