Sometimes I change the results after say rework or reinspection.In such case I want to also track the original results.How is it possible.
Hi,
In the control indicators of the mic, check the field u201CRR changes docsu201D.
Vishal Jonnalwar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Create Change Documents During Results Recording
Use
If you set this indicator, change documents are created for this
characteristic when results are recorded based on characteristics.
Dependencies
Change documents are only written, if processing of the inspection
characteristic has already been completed (status 5) and the data
already exists in the database.
Now you will be able to see the changes in results by clicking the button "change history"
Vishal Jonnalwar