on 01-20-2010 6:21 AM
Hi Experts ,
Kindly help getting the solution for the below scenario.
Process :
Sales Order 1000 Kgs.
During delivery when empty truck is IN it is weighted at the weight bridge eg. 4400 kgs.
And later truck will be loaded with finished goods eg. 1000 kgs. and at the exit point OUT truck is weighted again eg. 5500 kgs
So tare weight is 4400 kgs
Gross weight is 5500 kgs
Net weight is 1000 kgs
We want to capture the above information in the sap system directly from the weight bridge, currently a separate local application is used for weighting purpose
Which produces above said data.
We also want to build up some control points in sap may be possibly by user exits that if net weight is MORETHAN 1000 kgs with allowed tolerances, SYSTEM should
Stop further processing of Delivery Order.
Regards,
Saleha
Hi Michael,
I don't have any idea about this Interfacing.
Could you explain me what is this MII.. and the complete process that is at the third party and what needs to be available in SAP side..
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Go through the below mentioned link, these will give you an overview of SAP MII.
[Link1|http://help.sap.com/saphelp%5Fxmii115/helpdata/en/]
[Link 2|http://help.sap.com/saphelp_mii121/helpdata/en/43/e80b59ad40719ae10000000a1553f6/frameset.htm]
[Link 3|http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/901c6d6b-f6b2-2b10-6899-ce956d4efb5e?quicklink=index&overridelayout=true]
-Suresh
Saleha,
Do you have MII available to provide this interface? If not, you may be better off in a different forum.
Regards,
Mike
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
10 | |
5 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.