on 01-19-2010 11:55 AM
Dear Gurus,
I have a stock of a material 100MT,with batch number a .i am using batch charcteristic values as b and c with classification for batch a.i am doing PGI for 10 MT.In MB51 if i am seeing the material doccument.I am seeing the despatched qty 10,with batch number a and charcteristic value b and c.No problem till now.
As per my scenario,Now I am doing MSC2N with batch a, and i am changing the charcterictics values as b1 and c1.
Now if i am checking material doccument for the previous one (601),in classification i am seeing b1 and c1,but as per my requirement we should see batch charcterisctic values asly b and c for 601 which i have done previously because while despatch it was b and c only.
What I have to do from my end.Please help me where i have to do configuration.
Guna
Hi,
Batch mgt itself is one type of master data, when you chages Batch then it will affects all prvious documents too.
Kapil
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
answerd
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
104 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.