cancel
Showing results for 
Search instead for 
Did you mean: 

Batch problem

Former Member
0 Kudos

Dear Gurus,

I have a stock of a material 100MT,with batch number a .i am using batch charcteristic values as b and c with classification for batch a.i am doing PGI for 10 MT.In MB51 if i am seeing the material doccument.I am seeing the despatched qty 10,with batch number a and charcteristic value b and c.No problem till now.

As per my scenario,Now I am doing MSC2N with batch a, and i am changing the charcterictics values as b1 and c1.

Now if i am checking material doccument for the previous one (601),in classification i am seeing b1 and c1,but as per my requirement we should see batch charcterisctic values asly b and c for 601 which i have done previously because while despatch it was b and c only.

What I have to do from my end.Please help me where i have to do configuration.

Guna

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Batch mgt itself is one type of master data, when you chages Batch then it will affects all prvious documents too.

Kapil

Answers (1)

Answers (1)

Former Member
0 Kudos

answerd