cancel
Showing results for 
Search instead for 
Did you mean: 

Customer wise inspection during Delivery

vineeth_varghese
Active Participant
0 Kudos

Hi All,

I am having a Finished Material which will be supplied to 2 customers, say A and B. Customer A requires inspection before delivery and when the same Finished material is delivered to customer B, B does not want inspection to happen.

In material master for this material I already activated 10 inspection type.

How can I control lot creation/inspection by customer wise for same Material.

Thanks and Regards,

VV

Accepted Solutions (1)

Accepted Solutions (1)

former_member42744
Active Contributor
0 Kudos

you need to create a "Quality info record in SD". you'll find it under QM>Quality planning>Logistics Master Data-->Quality Info Record:SD.

Transactions QV51,QV52, QV53.

These are set up by material and customer.

Select "By customer" if the you don't want the inspeciton lot type 10 created. This setting tells the system that the customer will handle all inspection and no inspection at delivery should be done.

"After delivery" allows the PGI prior to UD.

"Before delivery" requires the UD to be completed prior to PGI.

Craig

Answers (0)