cancel
Showing results for 
Search instead for 
Did you mean: 

Note 1168120 - patch 10.1

Former Member
0 Kudos

I need help to understand what exactly is/was the issue:

"

The following issues have been resolved in Support Package 10 Patch 1:

o While doing Risk Analysis in CUP, if any mitigated role is added by removing the existing role, then Risk Analysis shows the mitigated risk. However, the same Mitigated Role is ignored correctly, when it is added without removing the existing role.

"

..add a mitigated role by removing the existing role... ?

Thank you

Mesly

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Thank you Ankur Baishya.

former_member366047
Contributor
0 Kudos

Melsy,

Let me try to explain.

The issue was when you performed risk analysis in CUP, and you remove a role, whose risk was mitigated, CUP was still reporting a risk as if the role was never removed.

Thanks!

Ankur

SAP GRC RIG