on 01-15-2010 4:51 PM
I need help to understand what exactly is/was the issue:
"
The following issues have been resolved in Support Package 10 Patch 1:
o While doing Risk Analysis in CUP, if any mitigated role is added by removing the existing role, then Risk Analysis shows the mitigated risk. However, the same Mitigated Role is ignored correctly, when it is added without removing the existing role.
"
..add a mitigated role by removing the existing role... ?
Thank you
Mesly
Thank you Ankur Baishya.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Melsy,
Let me try to explain.
The issue was when you performed risk analysis in CUP, and you remove a role, whose risk was mitigated, CUP was still reporting a risk as if the role was never removed.
Thanks!
Ankur
SAP GRC RIG
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.