on 01-15-2010 11:07 AM
Hello,
I am trying to configured delta pull in UWL, but when I create a new SYstem in UWL administration, I get the message:
Could not verify if the backend of system WADCLNT200 is configured for optimized delta pull.
I need to implement delta pull because we have a lot of performance problem with UWL.
My portal is 700 SP18 and backend system 6.40
Any idea¿?
Thanks and Regards
Noemí
I need to implement delta pull because we have a lot of performance problem with UWL
Most likely you do, And your question is?
Regards
Juan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Juan
I am facing performance problem with UWL so I am configuring delta pull.
I created rol SAP_BC_UWL_SERVICE and uwl_service in the backend system WAS 640. I also created jobs following instructions in http://help.sap.com/saphelp_nw04s/helpdata/en/eb/101fa0a53244deb955f6f91929e400/frameset.htm.
Also created RFC Destination in Visual Admin of portal
When I amd creating the UWL System WADCLNT200 in the portal, I try to put in field "Delta Pull Channel Refresh Period (in Seconds):" the value 60, but when I saved the system I get the message:
Could not verify if the backend of system WADCLNT200 is configured for optimized delta pull
If I edit again the System WADCLNT200 created, there is not value 60 on Delta Pull Channel Refresh Period (in Seconds).It is empty. I am unable to save the value 60.
My question is if you know how can i solved the message "Could not verify if the backend of system WADCLNT200 is configured for optimized delta pull".
Thanks in advanced for your help.
Kind Regards
Noemní
The documentation that you used is for a NW07 so you probably should have taken that into account... no I'm not an expert in the area but check for the prerequirements before going any further, also most of the notes related to the issue are for 7XX systems, maybe open an OSS message.
Regards
Juan
hi Noemi,
Was you able to resolve the issue .
we have all the the software component as per SAP Note# 1133821 installed.
Also the UWL_SERVICE must the be user ID on the backend system that runs background job RSWNUWLSEL.
Even if getting the same error :
"System <System_Alias> is not configured for optimized delta pull. Check the uwl_service user configuration."
Your help and reply is appreciated.
Regards
Pravesh
User | Count |
---|---|
79 | |
9 | |
9 | |
7 | |
7 | |
7 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.