Hi,
When i am doing WBSE planning through CJR2 transaction, system is not generating and CO document, and i could not able to see the line items in PS standard reports of S_ALR_87013543.
Regards,
S Vasu
Thread locked - see reason below
Edited by: Virendra Pal on Jan 11, 2010 12:01 PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Thanks for your reply. Can u please elobarately expalin how to finish this process. As i am a CO consultant, i have a little idea on PS. and also confirm
i have activated the integrated planning check mark in year version settings as well as controlling settings of project profiles master data. By this time, system is generating cost documents and line items for cost center planning but not for CJR2 Planning.
Please confirm, how far, this settings will be useful for generating plan documents, and at the same time, system is not storing any values at table level. or is there any pre requsite for generating of planning documents ever after activating of integrated planning.
Regards,
S Vasu