Order not seen in Md04 co09 co06 v_v2

Former Member
0 Kudos

Hi

User created order and chnaged the Item 40 with the confirmation date 13.01.2010 , at the item 40 the material was changed by new materila with the 5 quantity, but now this order No after the item was chnage d is notr seen in the Mdo04 and co09 co06.

Plz let me know what would have been the reasond for this.

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi raj,

Once you re-Run the MRP in MDo2 and Check it.

Regards

raj.

Former Member
0 Kudos

Hi Experts

I refreshed the in MD04 and re run md02 even then the order number is not seen MDo4 and co09 after the item 40 changed with diffrent material code and quantity. first instance when I create the order with a Material it is seen in Md04,but afte going to Va02 and changing the line item with a diffrent Material and quantity is not seen

Please advise what other settings I need to check.

Thanks In advance.

Shiva_Ram
Active Contributor
0 Kudos

Hi,

Check the material master data whether checking group is assigned in availability field in Sales/plant and MRP2 views.

If material master data is OK, then try to run program SDRQCR21 in SE38 for the material. The requirements can be captured in MD04.

Regards

Former Member
0 Kudos

thanks

Former Member
0 Kudos

Hi,

After changes made, R u refreshed MD04, Refresh it,