Rearrange the WBS elements those are at same hierarchy level.

Former Member
0 Kudos

Hi Experts

How to rearrange the order of WBS elements in a project structure, which are at same hierarchy level?

Ex: I have created WBS elements in this order:

PP/10001/RBD

PP/10001/KDR

I wish to move the second one to be at top.

warm regards

ramSiva

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi all

The derive structure functionality arranges in alphabetical order with in the level. Please suugest if any process exists.

warm regards

ramSiva

virendra_pal
Active Contributor
0 Kudos

select WBS and then via menu path try this

Edit _> WBS -> level up or down

Former Member
0 Kudos

Hi Virendra

This functionality changes the hirarchy level of selected WBS element and not the place of WBS element with in the hierarchy level.

warm regards