Supply variation - how to unconfim the confirmed STRs ?

Former Member
0 Kudos

Hi,

I have the following scenario-

One Production Plant supplying to a Hub. The Hub supplies to various DCc.

I run CTM / Heuristic, which create the Planned STRs btw DCs and HUB; and btw HUB and the Production plant.

Next I run Deployment Heuristic, with Fairshare rule A.

Pull Depl Hz = 3 wks

Push Depl Hz = 3 wks

I run depl heuristic from the hub to various DCs.

On the HUB,

ATR = Stock and STOs coming from the Production plant for the next 3 weeks.

ATI = Sales orders.

Now looking at the 3wks Planned STRs, I have confirmed them based on the 3weeks STOs.

The same result . confirmed STRs are sent to ECC.

Now , after 1 wk, I realise there is a huge variation in supply.

i.e. the daily STOs of 300 qty, will not come , but only 30 per day...

Now, with this changed scenario on the supply side, how do I unconfirm the confirmed STRs.

regards

Niranjan

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Looking at your scenario, u have confirmed the STRs on the basis of STO, now there is fluctuation in the supply side

( STO),

There are two situations

One that your confirmed STRs can t become into STO (TLB Output) if you run the TLB on the basis of stock, so shipment can be controlled.

Other option to rectify the same is to delete the confimed STRs and run the fresh Deployment considering the fersh STO ( supply side).