on 12-31-2009 5:27 AM
Hi QM Guru..
when i do UD for fish material. with QA32....in QA32 showing inspection lot no..but when i select line item of inspection lot and click on inspection lot..one window open..when i go inspection specification for task list..when i click on task list....show the massage....
but i all ready created inspection plan from QP01...i have over ther MIC and sampling procedure also
No inspection plan could be found
Message no. QA278
Diagnosis
A task list could not be found for the selection criteria. The inspection setup for this material in the quality management view of the material master defines an inspection with a task list.
System Response
Sample calculation and inspection lot release are not possible.
Procedure
Check the:
Selection criteria
Material/task list assignment
Task list status
Task list usage
...
Task list usages i have taken 5 for GR
status 4 general release
kindly suggest me why task is not taking...i have already created task list
kindly suggest me
Regards
Aqueel
resolved
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi ,
please check the following in inspection plan :
1. date whether insp. lot is created within that date range.
2. lots size mentioned in the header.whether inspection lot qty. lies in that range.
3.check status - it shud be relaesed.
4.task list type
5.deletion flag
kindly check the above , please revert back if its not working .
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi boss....i have checked all
.1 date whether insp. lot is created within that date range. ...the range date is 31.12.2009 to 31.12. 9999
2. lots size mentioned in the header.whether inspection lot qty. lies in that range. lot size 1 to 99999999999
3.check status - it shud be relaesed.......wher i will cheked status released....kindly suggest me t
4.task list type.......... 009 all task list
5.deletion flag ..... de selected
6 in header Usage...05 and status ...04
kindly suggest me
what to do
Regards
aqueel
Hi,
Check inspection lot date and task list date .
Task list released date should be before inspection date of inspection lot date.
Regards,
Vishal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Vishal
production order and confirmation has been created 30/12/2009 and today. i have attached qm in material master (04). then i have done MB31 (101).....now it show material in quality and lots has generated...
but when i do inspection and click on task list showing that massage
kindly suggest me what to do...
is any setting require for material master?
plz help me
Regards
aqueel
Dear,
The "Inspect with task list" and "Material specification" indicators are set for a material in inspection type 04. However, no material specification exists.
Check the quality plan said material in QP03 with valid date Lot size and status as release(usage4 and satus 5), check deletion indicator.
Please reset the inspection lot go to QA02 assign the task list to lot and then have the status of the lot as REL and then do the UD.
Regards,
R.Brahmankar
Dear,
Create the another inspection plan thorugh QP01 enter your material, Plant and key date as back dated say Key date 20.12.2009
Then next screen
Usage 5
Status 4
From Lot Size 1 To lot size 99.999.999
Then assign your MIC and save the plan.
Then go to QA02 enter the same lot no click on second tap Insp Spacification here click on Tasl List/Insp button. then go to third tap sample and clcik on sample button and save the lot.
Then go to QA32 check the lot status as REL then go ahead.
Regards,
R.brahmankar
Dear,
What is the status of lot?
Go to MM02 quality view check the insp type detailed screen - automatic assignment controls the insp plan assignment. Also check all setting for 04 insp type.
Also check the UOM in the plan QP02 is the same UOM as the material in the lot. Have you assign the MIC in plan?
Regards,
R.Brahmankar
Dear,
IN QP02 mark first task list mark for deletion. So secnod with back dated will be there.
Go to QA02 In Inspection specification tab, check the key date and match it to key date of Inspection Plan key date. When you do this change, your button for Task List / Spec will open. Now select that and you will thus assign the inspection plan to inspection lot. Now go to Sample tab and carry out the same procedure for assigning the sampling procedure.
Also refer this link,
Regards,
R.Brahmankar
Hi boss...
Right Now i have created fresh material and BOM and the rate routing...and production order..and cogitation then planing QP01
i have maintained all parameter correctly....in header usage 5 status 4 lot size 1.
MIC and sampling procedure and catalogs...
after confirmation of order i have done MB31....then i see QA32 there was lot no with material....
again i have done inspection lot clicked on tasklist..and sample
same massage give
No inspection plan could be found
kindly suggest me there are any setting in SPRO for fetching task list and sample
regards
Dear,
Is this quality Plan is back dated and Lot size should be 1 to 9999,999.
Why are you creating rate routing? check lot for 04 insp type in QA02.
Or for old material just create one new order and test it once again.
You can check the statuses in config.
QM>Quality Planning>Inspection Planning>General>Define Task List Status.
You should find that "4" is in there with all the check marks on.
QM--> Quality Inspection --> Inspection Lot Creation --> Maintain Inspection Lot Origins and Assign Inspection Types.
There is a column called status. For each inspection ORIGIN, you can specify the status of the inspection plan. It appears someone in your system changed the 4's to an X and then created the status "X".
Regards,
R.Brahmankar
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.