Dear QM Expert,
I have created the sampling scheme at the normal and tighten, in normal inspection lot qty 100 and sample size 10, and tighten inspection lot qty 100 and sample size 50,
I have created sample procedure and assign sampling scheme, then i create the dynamic modification rule and assign sampling procedure to this rule. and assign this rule in inspection plan.
but problem is this that when i create the inspection lot of 100 it is also calculate only 100 of 10 and then i reject the qty or reject the inspection characteristic but it not change the rule not go to tighten, Please suggest me what should i do so that the control automatic go the tighten.
I have tried both dynamic modofication at lot and inspection type level but all in vain. i have mentained dynamic modification at lot creation level.
please help me to sort out this issue.
Thanks
Hi
Have you maintained the DMR in such a way that when one lot is rejected it should move to next level which is Tighten level.
Also remember that Reject one of the char & then Reject the lot.Then Check the Quality Level.
Regards
Sujit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Gajesh,
I have mentained DMR as follows.
dynamic modification at lot creation
Stage inspection severity initial
10 4 normal yes
20 6 tighten
in stage change if one lot is rejected goto 20 ie tighten inspection.
I have first rejected characteristic and then the lot but it is not changing level
please help.
Thanks
SJ
Hi
Please check some basic things...
1.have you Assigned any "Char weightage" like Critical ,major etc..If so then in customization check the "no skip" indicator for the weightage.
2.what is status of lot QLCH is appering or not?
3.In sampling procedure have you ticked on "no level change" indicator.
Regards
Sujit
Did you actually go ahead and create the next lot or are you just looking at the quality level?
If you are just looking at the quality level without creating the next lot you won't see any change because the quality level won't be checked and updated until the next inspection lot is created since you have DMR at lot creation time.
Craig
Dear all,
Thanks for your quick reply.
when i checked DMR with quantitave chara. it is changing quality level but when i check it with qualitative chara. it is not working.
i have defined code group, code and selected set and assiged that selected set ti MIC. I checked for both modification level chara and inspection type.
Is any setting left? please help.
Thanks
SJ
Dear sujit,
1.have you Assigned any "Char weightage" like Critical ,major etc..If so then in customization check the "no skip" indicator for the weightage.
I dont know what is characteristics waitage and where to assign it.
2.what is status of lot QLCH is appering or not?
NO
3.In sampling procedure have you ticked on "no level change" indicator.
NO
Thanks
S J
Do you require the DMR to be at the characteristic level?
I think most implementations try to use "At Lot level" when ever possible.
Inspection type level is rarely used unless you are creating a custom inspection type for a special process.
Try DMR at the lot level and see how you make out.
Craig
Dear SJ
Please let me know DMR Rule that you have maitained
Regards
Gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
11 | |
10 | |
6 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.