Hi

I´ve a doubt with the post-installation tasks of the installation of the sap system. The default clients are 000,001 and 666.

In with client I´ve to realize this tasks?In the client 001 and after that I realize the client copy of the client 000. The changes are cross-client?

More thanks

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Ruben,

Please let us know which SAP Product and version you have installed. Because there are seperate set of post installation activities for each Product such as ECC, PI, EP, CRM,SRM etc.

For Ex: If you have installed a ECC system, most of the initial post installation activities such as STMS configuration, SGEN etc need to be done on client 000. This information is very well available in Post installation guides.

If you have installed a PI system, you need to carry most of the PI specific post installation activities in the java UME client i.e by default it is 001. But you can also perform the activities in any custom client by having a client copy and come configuration changes.

Cheers....,

Raghu

Former Member
0 Kudos

it´s SCM 7.0