Hi all,

I need to pick up the transport costs

relaeted to every stage:

I mean,is it possible to calculate de cost and tranport time from one stage to another.

Lets say,I have in one route 4 stages,could I see the time of the transport from one to another and the cost?

Thanks in advance and best regards

L

Accepted Solutions (0)

Answers (4)

Answers (4)

former_member588542
Active Participant
0 Kudos

Thanks

Former Member
0 Kudos

Hi,

You can able to see time and cost per stages.

Define transportation connection point T-CODE 0VTD,

like : DUBLIN. GALWY, CORK

Now go in to T-code 0VTC

Select your route >>>Double click on Rote stages at left side >>> speciefy Destination & departure pint & maintain time,duration etc.

Now in shipment document create this stages, like

Dublin to Galway

Galway to Cork

and calculate cost on the basis of stages in shipment cost document

kapil

Edited by: Kapildev Farakte on Dec 22, 2009 11:00 AM

Former Member
0 Kudos

Hi,

Calculating the transport costs per stage is standard SAP configuration..

1) Based on eacjh leg, you can define your item category.

2) Each item category is further assigned to item category group.

3) This item category group helps in determination of shipment cost procedure.

4) Based on this you can determine costs for each stage.

As far as I know, Calculation of time based on stages is not standard SAP but you can check the "Dur and distance" tab at each stage level.

Regards

Karan

Former Member
0 Kudos

Hi

Please follow instructions from note 840007

For the above-mentioned requests, special scale bases were set up in the

shipment cost processing:

o Transaction T_06: Maintain all mandatory fields in the

corresponding condition type as usual.

o Now go to the 'Scales for conditions' screen.

1) To determine the total duration, enter the following in the

'Ref' column

Scale base T0 (according to F4 help).

2) To determine the travel time, enter the following in the 'Ref'

column

Scale base T1 (according to F4 help).

3) To determine the queue time, enter the following in the 'Ref'

column

Scale base T2 (according to F4 help).

o Save this entry and go back to the Conditions Overview; now there

is a 'T' (=multidimensional) in the 'Calculation type' field and

in the 'Matrix maintenance' field, there is a '1'

Page 2

(1-dimensional). This is necessary so that the corresponding

shipment cost specific functions will run.

o Now save the condition overview as well.

o Transaction VS01: Now maintain a scale with

1) Scale base = 'T0' (Tab title 'Scale') and

Calculation type = 'T0' (Tab title 'Calculatn')

2) Scale base = 'T1' (Tab title 'Scale') and

Calculation type = 'T1' (Tab title 'Calculatn')

3) Scale base = 'T2' (Tab title 'Scale') and

Calculation type = 'T2' (Tab title 'Calculatn')

and define the scale values.

o Transaction TK11: Assign the scale of your condition type that

you have just created, maintain the freight rates and save the

condition record(s).

During the shipment cost calculation, the time-related condition should

be calculated.

Note: to receive a result < > 0, you must maintain the above-mentioned

fields in the shipment; in this case header-relevant and item-relevant

shipment costs (KOSTY = A B) are distinguished between and the

corresponding fields are used in the shipment (VTTK~ or VTTS~).

regards,

Ramana

former_member588542
Active Participant
0 Kudos

This Note iss very useful,

only problem I see now is ,when creating the condition record in TK11,

is not possible to make any modification in the value field-Do you know where can be problem?

Thanks in advance and best regards