on 12-19-2009 5:57 AM
Hi,
We have a 3 system landscape. (DV,QA & Prod). Transport route is DV -> QA -> Prod
I want to introduce a new system (a copy of the prod system) to the existing transport route such that the resulting transport is as follows.
DV -> QA -> UT -> Prod
Any guidance on the pre-requisites and aspects to watch out for before and during this activity will be much helpful. Thanks for your time.
regards,
Hi,
You just need to include the 4th system into the existing transport domain and then reconfigure the transport routes.
Please check the below thread:
Once you include it in the transport domain, do to the transport routes > edit mode > include the system in the graphical editor and add the route as required > then save and distribute the configuration.
Regards,
Jazz
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
86 | |
10 | |
10 | |
9 | |
6 | |
6 | |
6 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.