Hi, we do periodic inspection for all the materials stored in stores for every 6 months. Please advise what are the steps involved in mapping this in qm?

Accepted Solutions (1)

Accepted Solutions (1)

former_member186399
Active Contributor
0 Kudos

Dear Yadav

You can see the next inspection date in the UD screen

Regards

Gajesh

Former Member
0 Kudos

Dears, I observed that "the next insp date field (in ud) and the qa07 t-codes" are properly functioning only if we activate batch management. otherwise it is not working. please advise is there any method?

Former Member
0 Kudos

Hi Yadav,

In the prerequisites of recurring inspection,it is clearly mentioned that the material should be batch managed.So you have to manage it in batches.

Prerequisites

The system creates inspection lots automatically for recurring inspections if the following conditions have been met:

Each material to be inspected is defined as a batch material in the material master

An inspection interval is specified in the Quality Management view of the material master

An inspection type is active for inspection lot origin 09 in the inspection settings of the material master

The inspection settings in the material master specify an inspection using a task list or material specification (if you want to record results for inspection characteristics)

A Next inspection date is specified for the batch in the batch master

If you intend to trigger a recurring inspection manually, you have defined your parameters for the recurring inspection in the corresponding report

If you want the system to trigger a recurring inspection automatically, you have:

Defined your parameters in the report program for a recurring inspection

Saved the report as a variant

Planned the variant as a background job

http://help.sap.com/saphelp_46C/helpdata/EN/89/9bb43418e43b4ae10000009b38f83b/frameset.htm

Vishal Jonnalwar

Edited by: VISHAL JONNALWAR on Dec 17, 2009 12:17 PM

Answers (3)

Answers (3)

former_member186399
Active Contributor
0 Kudos

Dear Yadav

Yes vishal is right. Only batch managed materials can undergo recurring inspection

Regards

Gajesh

Former Member
0 Kudos

Hi yadav,

You can use recurring inspection here.Inspection type 09.

Vishal Jonnalwar

former_member186399
Active Contributor
0 Kudos

Dear Yadav

This is where recurring inspection(09) comes into place. For this find the following setting

1) Activate inspection type 09 in the material master

2) Maintain inspection interval of 6 months in the QM view

3) When UD is given for the inspection lot for the first time system automaticaly updates the next inspection date

4) You will have run QA07 or schedule it in QA05. In this maintain the materail, plant and run using one of the option and opening period which is intial run days

Inspection lot will created with 09 type. When the UD for this lot is given system automaticaly updates the Next inspection date.

For batch managed materials this inspection is more effective

please check and revert back

Regards

Gajesh

Former Member
0 Kudos

Hi, i have activated 01 and 09 insp type for roh material. while gr against po, 01 insp lot created and ud has been taken. now please advise where to check the next insp date for that roh material? please note that i mentioned 1day as insp interval in qm view. while running qa07 with materail, plant and 1 day as run days, no results found. we do not use batches. please advise.