schedule lines are not getting confirmed even though stock is there

Former Member
0 Kudos

HI,

i want to discuiss one sensitive issues which is a simple one.

my schedule lines is not getting confirmed even stock is there at sales order.

there is no delivery block.

there is no minimum stock level.

there is no credit check for that.

there is stock of 2 EA in that plant and storage location, but stock is not getting confirmed at sales order level or transaction level.

even stock is there it is going to avaliability check overview screen and giving stock confirmation after 12 days.

even i checked all the dates.............but its of no use.

what to do ?

after testing all the possible options i am taking help from

please help me in this regard,

regards,

balajit

Accepted Solutions (1)

Accepted Solutions (1)

Former Member

Hi,

Pls check the flollowing possible scenarious:

1) Check any open sales orders for that material.

2) Check any reservations for that material

3) Check the field lead time in the sales document type.

Pls check and revert back ifneeded.

Thanks and Regards,

SUBBU..

Answers (5)

Answers (5)

former_member266852
Active Contributor
0 Kudos

Hi

you need to check the following.....

First check the Factory calander of your plant whethear some holidays or not

Second most importantly you have to check which stretagy group is assigned in the material . whethear it is make to order or make to stock. change it as make to stock.

"What happened if material stretagy group is make to order then from sales order system generate requirement of that material against that particular stock, that time system do not consider the unrestricted stock and not confirm schedule line."

Regards

Shambhu Sarkar

Former Member
0 Kudos

Hi,

Also check the Loading time w.days and Pick/pack time wrkdys for shipping point

check Transit time and transportation lead time for Route

Menu path: IMG>sales and distribution>basic function>Delivery scheduling and transportation scheduling>Maintain duration

Regards

Senya

Former Member
0 Kudos

Hi Balaji,

Any updates on the issue tha tyou are facing?

Post the solution once you find the same.

Regards,

SuryaD.

former_member184555
Active Contributor
0 Kudos

Hi

Please check the ATP(Tcode CO09) quantities and not the physical stock in plant.

Thanks,

Ravi

former_member1091983
Active Contributor
0 Kudos

Hi,

Also check at item level Route field under Shipping tab and Factory calendor in SCAL as well..

Reg,

JJ

Former Member
0 Kudos

Check configuration for schedule line in Transaction Code: VOV6

Select the appropriate schedule line and go to details. Ensure that the field 'Item rel.f.del' is checked.

Regards,

Rajesh Banka

Former Member
0 Kudos

hi,

i apprecaite ur reply,

but it has been checked sir.

regards,

balaji