on 12-14-2009 7:06 AM
Hi
How to move the stock from the raw material storage type to production storage type.
note that both stoare type be in same storage location only.
pls reply me
You need to Activate Material staging in your warehouse & 100 storage type.
See Interface-WM-pp in this link http://help.sap.com/saphelp_47x200/helpdata/en/c6/f85c504afa11d182b90000e829fbfe/frameset.htm
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Raj,
I WM process, issue or transfer to Production process results in picking of material from the RM storge location / storage type.
If you mean your production stoarge location is same as that of the RM stoage location, it is just a tranfer within a warehous.
which you could do with posting change document. This doesnt reduce your WM stock.
If the production stoarge location is differnt from RM stiage location, then it is picking process from WM and goods issue.
this reduces your WM stock.
hope it helps.
Regards
Harish
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.