Currency issue in WBS element

Former Member
0 Kudos

Hi,

I want to maintain two different cost centers belonging to different company codes (one with USD and other with INR) in WBS element level in requesting and responsible cost center field. When I do this, I'm getting an error message stating that "currency in requesting company code must be company code currency". Please let me know how to overcome this issue and maintain cost centers with two different currencies.

Aman

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Closing the thread

former_member214674
Contributor
0 Kudos

Aman,

This is standard functionality cost center company code should be same as WBS company code.

Question:

Why you want to assign cost center's from diferent company code to one WBS element?

Thanks

Aby

Former Member
0 Kudos

The issue is the responsible cost center (where the work is done) operates in a different country, and requesting cost center (where the work is being requested) operates in a different country. Based on my investigation SAP standard functionality doesn't allow to save these two cost centers in one WBS. Please let me know if there are any other way in SAP to overcome this issue.