How to create requirement for BOM, not for its components?

Former Member
0 Kudos

Dear gurus,

I have never worked in PS module before. Now I have the following task:

There is Project, Network and WBS. I inserted material for operation in WBS and exploded the material.

Now the system must create requirement for this material but NOT for components of BOM. How can I configure the system?

P.S. We don't use MRP and we can't change Material Master Data.

Edited by: Azat Fayzullin on Dec 8, 2009 12:44 PM

Accepted Solutions (0)

Answers (1)

Answers (1)

virendra_pal
Active Contributor
0 Kudos

Have you read SAP help on PS

also check this forum for similar posts

If you have never worked on PS module I am not sure if you will be able to configure the system

please attend some courses in PS from your local SAP academy course names are PLM200, PLM210, PLM220, PLM230, PLM240

for your specific requirements I would recommend PLM200 and PLM220

Former Member
0 Kudos

Dear Virendra Pal

I have configured the Project structure including WBS.

I have created material BOM.

I have created the reference points and assiged them to the activities.

The BOM explodes creating requisitions for its COMPONENTS.

But I need requisitions for the BOM header material.