I know that a production version is used to lika BOM with a routing..

if thr are BOMS 1 and 2 ,routings 1 and 2

Then BOM 1 and routing 2 will be a PV. BOM2 and Rout 1 will be a PV..

Is my undersa=tanding correct..

Please help me in creating a production version and how cud it be useful..

Thanks and regards

anuja

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi anuja,

Product Version is used for Same BOM different Routings,

Or for Single Routing Different Alt BOM.

For EX BOM 1 i,e say suppose a BIke is made in 2 sheds, the BOM For BIke will be Same, But manufature of 2 BIKES will take in

two sheds . SHED 1, will be ur first WORK Center, SHED 2 will be ur Second Work CENTER whre 2nd bike is being manufactured.

Now to book the COST in two different sheds you use two GRP Counter in one Routing.

BOM will be 1, Routing will be TWO for Same Material, with 2 group Counters.

now Production Version

0001 BIKE1 under shed 1 BOM 1 ROUTING XXXX 1 (GORUP COUNTER1)

0002 BIKE2 Under Shed 2 BOM 1 ROUTING XXXX 2 (GORUP COUNTER2)

When u create Order syetem Propose two Production version , whre u have to slect appropriate Pversion.

Regards,

Pavan

Former Member
0 Kudos

can anyboy explain me the process of creating the prod version in c223...

in steps..

sundaresan_velayudam
Active Contributor
0 Kudos

Same like in material master

IN C223

Enter plant in selection condition

In the Production version screen

Enter material

Production version No , description, valid fromdate, valid to date, Lot size range- alternate BOm and BOM Usage& routing details such as Routing No, counter Type ( master receipe or routing)

& click the line item & do consisitency check.

In C223, U can create a PV for mutiple item

Regards,

EVS

Edited by: Sundaresan . E. V on Dec 8, 2009 12:05 PM

Former Member
0 Kudos

Hi,

In c223, give plant, material, in slection condition tab. Below you can see production version. Just below give material, production version name, text and valid from date and press enter. You can give valid to date also other wise it will take as 12/31/9999. Click the line item and on the bottom click at detail view , there you give your routing and BOM detial and click at check, if it is green at BOM and routing then go and save it.

I hope it is clear to you now.

Regards,

Satyajit

Former Member
0 Kudos

what is the difference between the material in selection condition

and prod version

Ritz
Active Contributor
0 Kudos

anuja,

C223 is a mass maintainance transaction for maintaing production versions.

if you input materil number and plant in header screen ( selection criteria) it can give you all the versions maintain for this combination.

but if you want to maibntain production versions for different material in a plant you can leave material field blank in heade screen ( selection criteria) and input materials at lower screen.

check out and revert back .

hope it helps you.

Regards

Ritesh

Answers (6)

Answers (6)

Former Member
0 Kudos

HI,

T code C223 Production Version Mass processing

Enter Plant, Material, version number, Description , Validity from and valid to, Lot size from to , BOM usage, Details planning group (Task List Group ), Group Counter, Routing type, REM allowed (if Repetitive manufacturing). Issue storage location, Receive storage location.

In this T code you can create different material at same time i.e. one stork.

Regards,

Ashish

Former Member
0 Kudos

Hi,

Production Version (PV) is Combination of BOM and Routing.

BOM-1 & Routing-2 => PV1

BOM-2 & Routing-1 => PV2

BOM-1 & Routing-1 => PV3

BOM-2 & Routing-2 => PV3

You can set different PV for different lots size and validity period, Bom explosion dates and Based on MRP Group.

Functions of Production Version=>

http://www.sap-img.com/production/functions-of-production-version.htm

How System choose Production Version =>

http://www.sap-basis-abap.com/pp/how-system-choose=production-version.htm

Procedure=>

Tcode MM02=>go to MRP4 view then click on Production version button.

=>Enter version number, Description , Validity from and valid to.

=>Click on continue button

=>again click on Production version then select PV then clcik on Details.

=>Enter lot size, Enter task list type, Group and group counter, BOM usage

If your using this PV for repetitive manufacturing then select REM Allowed.

Then Clcik on CHECK button if everything right then Green signal.

Then in MRP 4 view you can see the Version Indicator get tick.

Regards,

Ashish

Former Member
0 Kudos
former_member207022
Active Contributor
0 Kudos

Dear

Production version is the combinatin of BOM and Routing. It is used to describe the production process to be used for planned/production order.

You can create using t.code C223

Enter the material, plant. In the detail screen, mention the Production version number, which type of routing, the alternative BOM and routing group. Then finally check the consistency.

Former Member
0 Kudos

Hi Anujah,

Please refer link below : http://help.sap.com/erp2005_ehp_04/helpdata/EN/ff/515fd249d811d182b80000e829fbfe/content.htm

Moreover you can use set of BOM and routing in production version.

Steps to Create Production Version :

1 Gp to MRP View 4

2 select Production Version

3 GIve Production Version and its Text

4 Then Click "New Details"

There you will find the lot of option for making the production version

a ) lot size option

b) Validity

c)planning Mode

d) Bill of material Assignment

. When you create more than one production version it ask you to select production version at the time of production Order Creation

    • you are also doing right as well

rgds

BV

former_member199502
Active Contributor
0 Kudos

Hi,

Yes you are right .Production version is used to link different BOMs and different routing.It helps us to have a different combination of BOM and routing

You can create PV in material master MRP4 view