Material Availability Date

Former Member
0 Kudos

Where in SAP SD configuration settings can I check to see what is the Material availability date ?

Material Master? Sales Doc type? Where else?

Accepted Solutions (0)

Answers (1)

Answers (1)

Shiva_Ram
Active Contributor
0 Kudos

Hi,

You can find the material availability date in the sales order line item level. In the sales order(t.code VA03), highlight the line item and click on the details button. Then click on the schedule lines tab. Then again higlight the item, where in the confirmation quantity is shown, then click on the shipping button at the bottm. In the next screen you can find the material avaialble date details.

The field is VBEP-MBDAT.

Regards,

Former Member
0 Kudos

Thank you . . . I meant where in configuration settings can I find what Mat Av Date has been configured ?

I need to confirm if the standard setting (backward scheduling / forward scheduling) has been left or has it been modified

Shiva_Ram
Active Contributor
0 Kudos

Hi,

Read the WIKI [Available to Promise (ATP) |http://wiki.sdn.sap.com/wiki/display/ERPLO/AvailabletoPromise+%28ATP%29]

Also check [forward scheduling simulation |https://forumsa.sdn.sap.com/email!default.jspa?messageID=6484027]

[how system determine material avl.date and loading date|]

Regards,