cancel
Showing results for 
Search instead for 
Did you mean: 

Requirement Class & Tye

MohanDesai
Active Participant
0 Kudos

What is requirement Class & Requirement Types in PS? I am trying to do Assembly Processing in PS. can soeone give the navigation path for them.

Regrads,

Bekele

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Please use strategy group 83 or 85 with requirement type KMNP or KMPN.

Kind regards, Aleksandra

Answers (3)

Answers (3)

MohanDesai
Active Participant
0 Kudos

OK

nitin_patoliya
Active Contributor
0 Kudos

For assembly processing scenario to run you need to create material, which you insert in sales order ( Based on your network and material setting in CN08 ) system will read standard network and create operative project from sales order. The above process is in front end.

But in Back end based on material you inserted in sales order system try to find our requirement type, based on you configuration in either your meterail master stretgy will prevail or your SD Item category will prevail and you arrive at requirement type & from requirement type to requirement Class.

The menu path for hte same isIMG--> PS -->Material --> Control of Sales order related production. ( not in reach of SAP log on menu path may be wrong ) Just check.

Also search in forum there are other material may help you

With Regards

Nitin P.

Former Member
0 Kudos

Hi,

Check the following thread,

Also refer this thread,

http://help.sap.com/saphelp_erp60_sp/helpdata/en/d7/b8853488601e33e10000009b38f83b/frameset.htm

At the bottom of the page on the left hand side you will a topic for Assembly Processing.

Hope this helps.

Please try to search the forum before posting. I am sure you will find readily available answers to most of your questions.

All the Best.

Best Regards,

Gokul

Edited by: Gokul on Dec 3, 2009 2:49 PM