cancel
Showing results for 
Search instead for 
Did you mean: 

Segregation of Inspection for material

Former Member
0 Kudos

Hi,

Currently we have scenario wherein there are two classification of material that need to be segregated. One goes through special handling and the other 1 normal.

Can you help? thanks.

Thank you,

Raymond

Accepted Solutions (1)

Accepted Solutions (1)

former_member186399
Active Contributor
0 Kudos

Dear Raymond

At any given point of time if you want to know the DMR status you need to go to QDL2.

Here you have option of chaging Next Inspection stage. If you want for next GR a Normal inspection then change the existing stage to normal inspection stage

Regards

Gajesh

Answers (3)

Answers (3)

former_member186399
Active Contributor
0 Kudos

Dear Raymond

I dont see any direct solution for this

If you have set DMR for a material , then it will follow the DMR stages. If you decide that the material has to go to normal inspection before doing the GR change the quality level as normal inspection.

Regards

Gajesh

Former Member
0 Kudos

Hi Gajesh.

What setting is needed to be changed?

Thanks,

Raymond

former_member186399
Active Contributor
0 Kudos

Dear Raymond

Is the segregation based on the vendor is there any relation to any objects or is it sole decision of the quality dept

Regards

Gajesh

Former Member
0 Kudos

Hi,

Segregation is per material.

Thank you,

Raymond

former_member186399
Active Contributor
0 Kudos

Dear Raymond

Can you briefly describe this concept

Regards

Gajesh

Former Member
0 Kudos

Hi Gajesh,

Basically there are two way of inspection in the system.

One, is to do normal inspection in which all materials are inspected.

Second, is use DMR in which for example 5 consecutive lots passed, succeeding 10 lots are not inspected.

The thing is sometimes a material uses the normal inspection but the same material can be changed and use the DMR.

Thanks,

Raymond