on 12-01-2009 9:21 AM
Hi Experts,
I have two TR's for the same material.Stock of material is available in different storage bins with different expiry date.
In the first storage bin say 20-18-02 stock is fully available for both the TR.But when I convert the first TR into TO, system picks the material from first storage bin say 20-18-02 and it blocks this storage bin till TO confirmation.
For next TO system picks the material from other storage bin even the expiry date is later.
My requirement is that system should pick the material from first storage bin against second TO even if the first TO is not confirmed.
Thanks
Regards
Mahesh
Hi,
try in IMG the field "Block upon stock rmvl" in the storage type definition, it must be blank.
Regards
AS
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
91 | |
8 | |
7 | |
4 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.