on 11-30-2009 6:06 PM
Hi all,
We are trying to reproduce an inbound delivery flow from R/3 (ECC 6.0) to EWM ( SCM release 5.1).
We created an Integration Model, and it runs in the correct way, because Product, Location and BP Data were created correctly in SCM.
Now, when we create an inbound delivery in R/3 with a Packaging material, in SCM an Inbound Delivery Notification is created, but the system does not create
in automatic way the linked Inbound Delivery in SCM, as the Sap library shows.
Running SLG1 transaction one of the error messages shown is: "HU number XXXXXXX is internal and cannot be assigned externally"
Can someone help us?
Thanks in advance
Regards,
Rossella.
Hi Antonella
Looks like the PPF actions which create the INB dely are giving an error since the HU settings are not complete. Make sure that the packing material in EWM (which is CIF from ERP and WH Product has been creared) has a valid HU type entered. Also ensure that the HU number range in EWM (external number range) is in sync with the internal number range if HUs created in ERP.
Hope this helps
Thanks
Deepak Joshi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
...sorry, it was a mistake
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.