Hello QM gurus,
I am trying to implement time based inspection. I can see the reference parameters(time-based, qty-based etc) in master recipe in operation details screen but I don't see the reference parameters in Inspection plan detail screen. I have maintained the 150 - time/qty based inspection points in the header and used QM01 as control key. Please let me know if I am missing something.
Thanks in advance.
Mithun.
Hi
check the Flow Variants for Inspection Point Completion
Variant 1: Quantity, Valuation, and Cofirmation (production)
Variant 2:Quantity, Valuation (production)
Variant 3: Valuation
Variant 4: Automatic Valuation Based on Inspection Point Definition
Variants 1 to 4
For an inspection during production: Variants 2 and 3 allow you to call up the confirmation transaction separately.
Variants 3 or 4
For maintenance orders: You can call up the confirmation transaction separately when you are on the valuation screen.
For sample processing: No confirmation is defined for this case.
So A quantity assignment and confirmation are not possible for this task list type:Q
Regards
Sujit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I'm sorry. IP are allowed for 04 inspections. However only freely defined inspection points are supported in standard SAP. If you look at the text document associated with the config for "Define Identifier for Inspection Points" it specifically says in there that:
"If you use freely defined inspection points with inspection plans
outside the production area, the time-based or quantity-based inspection
interval and the management of batches or partial lots is not supported."
I do think however you can do the following.
Make a copy of 150 Generated insp. point, quantity or time.
Call it 151 Generated insp. point, quantity or time for 04.
Make a copy of QAPP_CUST_IP_CREATE and link it to the 151 insp point identifer.
On the operation header go to the section "user-specifc fields" . I think you'll have one choice of "000001" in "Field Key" selection as delivered in standard SAP. You can have up to 4 text fields, 2 date fields, and 4 value fields. Decide which one to use and enter in the quantity you want to use for the creation of your inspection points.
You can then modify your copy of QAPP_CUST_IP_CREATE to look up this value from the operation header. Use it in the FM to create your inspection points. You will probably need a good ABAP'er for this as you may need to modify other sections of the FM to get it to work with the 04 inspection lots. But my suspicions are that the only reason it doesn't work with 04's is that the insp. plan operations don't have a place to keep the qty or time info like a receipe operation does.
Craig