Transfer PIR from APO-DP to R/3 - issue

Dsk
Active Contributor
0 Kudos

1. we have installed the new scm7.0

2. we have did all the required RFC settings and other pre requisites.

3. we are transfering the PIR from APO-DP to R.3, in /SAPAPO/MC8K - Manage Job Logs we are getting sucess message

4. When i check in R/3 i dont see the demand in the MD63.

- how to check the error?

- any other setting requried for this .

reg

Dsk

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi

Please check the logical system that is very imperative,and please check the out bound queues from apo system.(publication)

Thanks

Prasanna

Dsk
Active Contributor
0 Kudos

Answered, the logical system was not defined properlyt