Is it possible to do a TO between Sloc to Sloc? user wanted to have this way for better control and visibility of stock movement.

thanks

G

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

1. TR will be created if Stock transfer takes place between Storage locations when one is WM managed and another in not.

when stock transfer from WM managed Storage location to non-wm managed storage location using MB1B, system will generate TR. This will be used to create TO as pick list to remove stocks from issuing location.

Same applies when moving stock from non-wm managed storage location to wm managed storage location using MB1B, system will generate TR. This will be used to create TO to place stocks in warehouse.

2. Posting Change - with QM module when changing stock type from QI to Unrestricted or blocked, system generate posting change. This will be used to create TO. When confirm this TO, update stock type in WM. This can be automate by configuring IM - WM movement types.

Thanks,

V

Former Member
0 Kudos

While doing the TO the stock moves from Bin to Interim bin. I need to do a 302 to move it from the interim to the actual sloc. Can we do a one step stock movement in WM enabled plant? That includes physical movement as well.

thanks

Former Member
0 Kudos

Hi

Sloc to Sloc is a Transfer Posting in IM, if any one or two sloc's is WM managed then WM comes into hit.

if both the Sloc's are WM managed with same W/H assignement then PC will be created and subsequent TO creation and confirmation needs to be done,

If both the Sloc's belongs to different W/H numbers then TR/TO at sending sloc for stock removal and TR/TO at receivers sloc for putaway.

Regards

Amuthan M

Former Member
0 Kudos

Thanks Milind and Amuthan for your response that was helpful.

However I observed that PCN cannot be done when you have the Plant/Sloc is HU Managed. It is easy for IM managed plant, for WM managed it needs to be w/o HU. Please confirm.

thanks

former_member435196
Contributor
0 Kudos

Hello,

As far as I understand following cases are possible

Sloc to Sloc transfer in IM transaction (MB1B) in one warehouse results, posting change creation. You process this PCN using LT05

(ii) You can use T-code LU01 directly in WH without using IM transaction MB1B

(iii) If the issuing plant / storage location combination s assigned to a different warehouse number than the receiving plant / storage location combination, the system does not create a posting change notice. Instead,it creates two transfer requirements: one for stock removal from the issuing warehouse number, and one for putaway in the receiving warehouse number.

Thanks,