Any validity period or expire of maintain the skip indicator is there

Former Member
0 Kudos

Hi

Any validity period or expire of maintain the skip indicator is there.

Because we mantianed the skip lot for the materials. and it create the correctly upto some period and now eventhou we maintained in the insp type . it not show the X mark against the skip lot field for this lot for the materials.

Thanks

vraj

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

if you go to QDR3 ,you will find the

Reset Time Period for Quality Level in Days

Specifies the time period in days, after which the quality level reverts to the initial inspection stage.

This is in days.cycle of DMR will reset.

Also

In details of the stages you will find the indicator

Maximum Skip Duration

This will also reset the Quality level if value is maintained here in days

check have you entered anything here.

Otherwise skip do not have any validity as such.only these two field plays the role.

Regards

Sujit

Answers (3)

Answers (3)

former_member186399
Active Contributor
0 Kudos

Dear Raj

What is the status of the lot when the inspection lot is created and what is the quality level in QDL3

Regards

Gajesh

former_member186399
Active Contributor
0 Kudos

Dear Raj

What is the status of the lot lots and let me know what is the DRM setting you have

Regards

Gajesh

Former Member
0 Kudos

Hi,

What is the status of the lot lots

UD ICCO SPCO STUP

and let me know what is the DRM setting you have

u mean DMR.

DMR is LOT . dynamic modification -at lot creation

stage 10::

inspection severity : blank

skip : tick

ist: tick

short text: skip

No. of skips........ 9

Max. skip duration:blank

New insp. stage 20

Rejections 1

New insp. stage 30

stage20 :

inspection severity : 4 say

skip : blank

ist: blank

short text: inspect

No. of inspections.. 1

New insp. stage 10

Rejections 1

New insp. stage 30

stage30 :

inspection severity : 4 say

skip : blank

ist: blank

short text: inspect

No. of inspections.. 5

New insp. stage 10

Rejections 1

New insp. stage 30

Former Member
0 Kudos

i cheked all the setting . as you said, no days are maintained in both the cases.

anyother reason