on 11-19-2009 6:35 AM
Hi
Any validity period or expire of maintain the skip indicator is there.
Because we mantianed the skip lot for the materials. and it create the correctly upto some period and now eventhou we maintained in the insp type . it not show the X mark against the skip lot field for this lot for the materials.
Thanks
vraj
Hi
if you go to QDR3 ,you will find the
Reset Time Period for Quality Level in Days
Specifies the time period in days, after which the quality level reverts to the initial inspection stage.
This is in days.cycle of DMR will reset.
Also
In details of the stages you will find the indicator
Maximum Skip Duration
This will also reset the Quality level if value is maintained here in days
check have you entered anything here.
Otherwise skip do not have any validity as such.only these two field plays the role.
Regards
Sujit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Raj
What is the status of the lot when the inspection lot is created and what is the quality level in QDL3
Regards
Gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Raj
What is the status of the lot lots and let me know what is the DRM setting you have
Regards
Gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
What is the status of the lot lots
UD ICCO SPCO STUP
and let me know what is the DRM setting you have
u mean DMR.
DMR is LOT . dynamic modification -at lot creation
stage 10::
inspection severity : blank
skip : tick
ist: tick
short text: skip
No. of skips........ 9
Max. skip duration:blank
New insp. stage 20
Rejections 1
New insp. stage 30
stage20 :
inspection severity : 4 say
skip : blank
ist: blank
short text: inspect
No. of inspections.. 1
New insp. stage 10
Rejections 1
New insp. stage 30
stage30 :
inspection severity : 4 say
skip : blank
ist: blank
short text: inspect
No. of inspections.. 5
New insp. stage 10
Rejections 1
New insp. stage 30
i cheked all the setting . as you said, no days are maintained in both the cases.
anyother reason
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
7 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.