BPCA Configuration

Former Member
0 Kudos

We are trying to set up our solution manager system to use the BP Change Analyzer functionality.

Our ECC6 systems are configured in Solution SMSY from the Landscape Components down through Functional Components.

In STMS of our solution manager system we created the ECC6 system as an external system. Doing this allows for the ecc6 system to show up in the system drop down on the BP Change Analyzer screen of the Test management work center.

When we fill in the info on the Change Impact Analysis screen and click the drop down for Transport Requests and do the search we get the following error:

RFC: System Error in communication with managed system

Error in PAT03 Processing

We get this error if we check in the u201CChange Event Scopeu201D either one of the options (u201CFrom Transport Requestsu201D or From Delivery Transports from SAPu201D)

Versions

Solution Manager u2013 SAP EHP1 for Solman 7.0 u2013 Kernel 701 Sup. Pkg. lvl 39

ECC6 system u2013 ECC6 EHP4 u2013 Kernel 701 Sup Pkg lvl 23.

ST-PI is at 2008_1_700 in both systems

Issues:

1) How should TMS be set up to support this functionality

2) How do resolve the RFC Error?

3) We could not find any configuration guides for setting up BP Change

Could you point us to documentation for it?

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Problem has been resolved - I need to apply note 1356339 to the solution manager system