Dear sir

i have master data for qm . MIC AND SAMPLING PROCEDURE Only no inspection methed.

when icreate grop wise inspectionplanning by qp01it is created ,and then goto qpo2 and asiigine the material for that group.

then inspection plan is created all materials.

but when ido recording by lsmw or bdc ,system asks the inspection methed . so how can i record with out inspection methed by lsmw or bdc.

thanks and regards

Baswaraj

Accepted Solutions (0)

Answers (4)

Answers (4)

former_member186399
Active Contributor
0 Kudos

Dear Baswa Raj

I think for LSMW / BDC the inspection method is mandatory. Please create one dummy inspection method and assign the same

Regards

gajesh

Former Member
0 Kudos

Hi

In BDC or LSMW have you mentioned about the Inspection method.

Since you are not using the Inspection method while recording itself exclude the Inspection method.

This will not ask you Inspection method.

Regards

sujit

Former Member
0 Kudos

Please delete the Plant field which comes along with Inspection Method during your recording and system hence doesn't ask you to enter Inspection Method. Means, during recording please leave the field plant BLANK below the inspection method field by default it picks up the Plant entered in first screen.

Best Regards,

K. Raghavendra Nayak

Edited by: KAPPETTU RAGHAVENDRA NAYAK on Nov 16, 2009 9:39 AM

Former Member
0 Kudos

Check whether all steps in LSMW are correct or not.

u must have recorded step of inspection method in LSMW. delete that step and check again

OTHERWISE

u can create inspection plan through BDC