on 11-13-2009 6:22 AM
Dear All,
we are planning BDC for for uploading Data for inspection plans ( QP01 )
For already running Plant in header data ( QP03 display mode )
i can find option Dynamic Modification Criteria under this i have four options
material - ticked
vendor - ticked
customer not ticked - not ticked
manufacturer - ticked
But now when i want to create same material for new plant i cannot find ( in QP01 ) ( material exists in new plant )
option Dynamic Modification Criteria
material - ticked
vendor - ticked
customer not ticked - not ticked
manufacturer - ticked
How i can get the above
Let me in detail
Thanks in advance
Regards
kumar
Hi
this is a customization
QCC3>inspection lot creation>maintain Inspection lot origins & assign Inspection types--->select inspection type >here DCr that is Dynamic modification criteria->this is
001 Material
002 Material and customer
003 Material and vendor
004 Material and manufacturer
005 Material, vendor and manufacturer
Depending upon this setting , after selection of Usage & DMR this will appear in QP01.
In BDC you need not to select these things .they wll appear automatically
Regards
sujit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Sujit,
i have checked it
but i couldn't find plant level settings here
001 Material
002 Material and customer
003 Material and vendor
004 Material and manufacturer
005 Material, vendor and manufacturer
Except above highlighted is missing
Now plz let me know the above settings are maintained at client level or plant level ( QCC3 )
because i cannot find plant option
Can i go with BDC with the above settings
Regards
kumar
Edited by: kumar kumar on Nov 13, 2009 7:42 AM
Now plz let me know the above settings are maintained at client level or plant level ( QCC3 )
because i cannot find plant option
As Inspection lot origin & type are not at plant level Dcr is also not on plant level.
This setting is customized SAP standard setting.You can not change this.
You can only change setting like from 003 (Material and vendor) to 005( Material, vendor and manufacturer)
it is depend which inspection type & what usage you are taking.
What you can do go to QP01 and change the usage of the task list keeping DMR at Lot level.
Check what haapens
Can i go with BDC with the above settings
Better not to use these fields in BDC.
Hi
Can you let me know first should i creat QM info records ( QI01) before inspection lot
Yes if you are using control key in QM like "vendor released or delivery release then Before creation of Inspection lot( or PO/GR )
info record must exists.
Let me know the sequence which one should be crated first as per Std procedure
QM view>QInfo->Task list(with proper usage)-->Inspection lot
also task list creation date must be prior to inspection lot creation.
Regards
Sujit
User | Count |
---|---|
98 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.