on 11-10-2009 7:00 AM
Dear all,
i performed GR for one material & inspection lot has been created in QA32
when i am trying to do Results recording
system gives me error Sample size could not be calculated
Regards
kumar
Dear Kumar
What is the status of the inspection lot ?
Have you attached the inspection plan for the material and sampling procedure is available
Regards
Gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
For the material please create an Inspection Plan which has got MICs assigned to it which in turn has Sampling Procedures.
Unless and until this is done the status of Inspection Lot would not be changed to REL.
You cannot do RR for the inspection lot which has got CRTD status.
Best Regards,
K. Raghavendra Nayak
Goto QA02 Transaction...
Enter the Inspection Lot Number...click on Task List Assignment Tab...if you find Group Number and its details in that screen then system has selected right inspection plan for the inspection lot....goto Sample Tab...you will find that system did not able to calculate the sample size...click on Sample Tab so that it can calculate...if that doesn't happen please go back to Inspection Plan.
Goto QP02...check what sampling procedure is assigned in the Inspection Plan for the MIC....for this click on Assign Characteristics Tab after selecting the Operation...
Best Regards,
K. Raghavendra Nayak
Dear all,
MIC's are assigned to inspection plan
the error i am getting
Sample size could not be calculated
Message no. QA275
Diagnosis
The scope of the sample could not be calculated because no inspection specifications (neither a plan nor a specification) have been assigned to the inspection lot yet.
Procedure
First assign inspection specifications to the lot.
Regards
kumar
Dear all,
Just now i observed one thing in QP02
Basically in plant 1 i have one ROH with all required QM data
same way i have done for same material in plant 2
in QP02, i am check checking for both plants in header data
in plant 1, under option parameters for dynamic modifications/inspection points
there is another option Dynamic modification criteria
under this option i have
material ticked , vendor ticked
customer not ticked, manufacture ticked
But in plant 2 in QP02 the above Dynamic modification criteria is misiing
Plz guide me
Regards
kumar
Hi
Go to QA02>enter lot>click on sample ( arrow symbol)
this will work
also
in QA02>enter lot>inspection specification>check on task list->environment at char level->Inspection char--->sampling procedure .here you can check sampling scheme used.
or
QA02->enter lot>environment(menu)-->inspection specification->sampling procedure.
Regards
Sujit
Dear Sujit,
thanks very much for ur detailed info
but still the problem presists
let me explain
Go to QA02-->enter lot-->click on sample ( arrow symbol)
system is saying the function u selected cannot be carried out
in QA02-->enter lot-->inspection specification-->check on task list----->environment at char level--->Inspection char--->sampling procedure .here you can check sampling scheme used.
system is saying no inspection plan could be found
No inspection plan could be found
Message no. QA278
Diagnosis
A task list could not be found for the selection criteria. The inspection setup for this material in the quality management view of the material master defines an inspection with a task list.
System Response
Sample calculation and inspection lot release are not possible.
Procedure
Check the:
Selection criteria
Material/task list assignment
Task list status
Task list usage
*can u just let me know how to know which sampling scheme is used for this lot i.e from QDP1*
Regards
kumar
Hi
what ever a message is coming ,
it seems that lot status is still CRTD
now
Go to QP01->create a task list for same material->check that the valid date of the Task list is prior to lot creation date.
if system shows the task list already maintained then in task list header(QP03) check the valide form date it must be prior to lot creation date.
then go to QA01>inspection specification tab->click on inspection specs->go to sample>click on sample.
save
check the status now in QA32 it must be REL
Now you can do RR
Regards
Sujit
Dear Sujit,
check that the valid date of the Task list is prior to lot creation date.
Thanks very much for ur above input
i was missing that
now a canceled & re-posted on current date
now i can see lot is having REL status in QA32
Once again Thanks to All my Repliers
This thread is closed
Regards
kumar
Hi
convert CRTD into REL status
1) Go to QA02
2) Menu > INspection lot > Reset Sample
3) Enter & Save
4) QA02
5) Inspection specification > Assign task list by click on Task/ specification
6) Go to Sample, do the SAmple calculation
7) Save
😎 Check whehter lot status is Rel
Regards
Sujit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear,
CRTD mean created status of inspection lot.
CHCR means characterstics required. in your case the the material master inspection view says characterstics required however your inspection plan does not have any cahracterstics. remove this tick form material master QM view or
assign the characterstics to inspection plan & both the status of inspection lot will change. you will be then able to process the inspection lot to move the stock from quality to unrestricted.
-In this case you create one inspection plan through QP01 for material code with validae date, status and lot size.
-Assigned the inspection plan through QA02 for same lot (At the time of assignment Key date should be current)
-Calculate the sample size by clicking over Sample tab and then Save the document.
-Status of inspection lot will get changed to REL.
Then go ahead.
Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.