Dear all,

what are all important things should be assigned for inspection plan QP01

let me know in detail

Regards

kumar

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

important things should be assigned for inspection plan QP01

At header level:

Dynamic mofication rule

Inspection point

sample drawing procedure.

at operation level:

work center

operation key

additional operation

at char level:

DMR

MIC

Inspection method

sampling procedure

PRT

etc

I hope this will add some value

Former Member
0 Kudos

Dear Sujit,

thanks for ur reply

will get back to you

Regards

kumar

Former Member
0 Kudos

Thanks to all my repliers

This thread is closed

Regards

kumar

Answers (2)

Answers (2)

rupesh_brahmankar3
Active Contributor
0 Kudos

Dear,

QP01 is same like the routing creation through CA01.

In QP01 , enter Material , Plant , Key Date , press enter.

Then create Inspection Plan as per your requirement.

Please refer this wikki,

https://wiki.sdn.sap.com/wiki/display/Snippets/ABAPProgramtouploadQMInspectionPlanUsingBAPI

Regards,

R.Brahmankar

Edited by: R Brahmankar on Nov 10, 2009 12:16 PM

Former Member
0 Kudos

Dear Brahmankar,

Thanks or ur reply

will get back to you

Regards

kumar

Former Member
0 Kudos

We define following Master Data's independent to each other:

1. Material Master

2. Master Inspection Characteristics

3. Inspection Methods

4. Sampling Procedures

5. PRT's

In Inspection Plan we define to the system that for one particular material what are all the parameters (MICs) to be tested using specific procedures (Inspection Methods and Sampling Procedures) and Instruments (PRT's), which have defined earlier.

Hope this is clear to you.

Best Regards,

K. Raghavendra Nayak

Former Member
0 Kudos

Dear Raghavendra,

Thanks or ur reply

will get back to you

Any more suggestions are kindly welcome

Regards

kumar